The Intelligent Work Management Platform
Learn how the McLaren Formula 1 Team finds its edge



Less time planning, more time pushing limits
"With Smartsheet, we’ve cut planning and preparation time for wind tunnel projects by 70%. What used to slow us down now flows seamlessly, freeing our team to focus on performance where it counts most."
Spencer Ford
Director, Machining and Additive Manufacturing
McLaren Formula 1 Team
Smartsheet Professional Services team helped condense multiple systems into a single platform.
achieved by the McLaren Formula 1 Team in the first 18 races of 2025, including seven 1-2 finishes.
parts tracked in Smartsheet from ideation to delivery.
data points computed per race weekend.
Smartsheet AI tools empower teams to do more
The Smartsheet Intelligent Work Management platform delivers adaptability and enterprise-grade tools to support work across industries. Save time by harnessing your sheet data to craft compelling ad copy, analyze sentiment, translate text, summarize task status, and more.
The perfect line through a project
Spencer’s team uses Smartsheet Gantt view and tracks the project's critical path to coordinate wind tunnel testing, sequencing tasks, dependencies, and milestones. This reduces bottlenecks and enables concurrent workstreams, allowing parallel prep and finalization of engineering elements.
* Product screens are for illustrative purposes only and do not contain actual McLaren images.

Get the right work to the right people — right now
McLaren Racing didn’t just schedule people — they aligned talent to critical moments. Run your team through this checkpoint:
⬜ Are high-skill roles scheduled at moments of peak impact?
⬜ Is resource availability visible alongside project deadlines?
⬜ Are roles allocated based on dependencies, not department lines?
⬜ Are time-off calendars integrated into project timelines?
⬜ Is capacity planning tied to project forecasting?
→ If not, you may be burning time — and talent — without realizing it.
Racing the clock with precision
In a world where wind tunnel time is capped at just two shifts a day, every hour — and every person — counts. The McLaren Formula 1 Team relied on Resource Management by Smartsheet to gain visibility into team availability and schedules, ensuring the right engineers, model builders, and testing priorities were aligned in real time. This kept the wind tunnel running at full capacity and minimized downtime between tests.

3 modes of modern resource management
McLaren Racing ran a hybrid model of precision staffing. Which of these best fits your team?
- Reactive: Resourcing based on who’s available
- Tactical: Assignments made via function or department
- Strategic: Resources aligned to critical path milestones and forecasted need
→ Many enterprise teams live in Mode 2. The fastest ones operate in Mode 3. Smartsheet makes the leap from tactical to strategic simple — with centralized views and workload heatmaps.
60,000 projects? No sweat.
Manage multiple portfolios — each made up of massive, complex projects — with ease. Automate and standardize governance without sacrificing quality.
Which product view solves which problem?
- Sequencing complex tasks → Gantt
- Task ownership and status → Board
- Bulk uploads → Table
- Executive reporting → Dashboard
- Cross-team visibility → Timeline
→ Your project isn’t one-dimensional. Your planning tools shouldn’t be either.
When data talks, teams accelerate
McLaren Racing leveraged Smartsheet Data Shuttle to automate critical aerodynamic and simulation data flow, eliminating manual uploads and reducing decision-making latency. This accelerated feedback loops and maintained alignment across engineering, operations, and leadership.